REFERENCES
INDUSTRIAL FACILITIES - COMPLETED PROJECTS
GÖZEN SECURITY |
Date of Completion:
Description of the Work: |
2018
Electromechanical design of Gözen Security buildings in İstanbul Grand Airport.
|
|
KÜTAHYA UNDERGROUND STORAGE FACILITIES |
Date of Completion:
Description of the Work: |
2013
Kütahya Underground Storage Facilities Cooling System.
Construction, mechanical & electrical installations and automation system of cooling and
super refrigerating rooms.
|
|
MACHINERY AND CHEMICAL INSTUTE |
Date of Completion:
Construction Area:
Description of the Work: |
2013
468.000 m
Machinery & Chemicals Instute Ammunitions Factory's central heating system installations,
- Sanitary,
- Sewage installations,
- Super heated water,steam and hot water installations,
- Steel constructions and pipeline bridge constructions,
- Concrete works of pipeline supports and administrative buildings rough construction works,
- Central Heating Plant installations,
- Electrical installations,
- Automation systems.
|
|
PAŞABAHÇE MERSİN FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2013
14.000 m²
Mechanical installations of absorbtion chiller systems and waste heat boiler systems in Paşabahçe Mersin Factory Buildings.
|
|
PAŞABAHÇE ESKİŞEHİR FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2013
48.000 m²
Fire protectioninstallations of Paşabahçe Eskişehir Factories.
- Monitored fire protection installations of LPG site.
- Dry type fire protection installations of warehouses.
|
|
GREEN CHEMICALS |
Date of Completion:
Construction Area:
Description of the Work: |
2012
8.000 m²
Mechanical installations of Green Chemical Gebze Factory buildings.
- Heating,
- Cooling,
- Ventilation,
- Fire protection,
- Sanitary,
- Sewage installations,
|
|
ORGACHEM FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2012
4.500 m
Mechanical installations and automatic control systems of Orgachem factory buildings.
- Heating,
- Cooling,
- Ventilation,
- Fire protection,
- Domestic water,
- Sewage water,
- Automatic control systems.
|
|
KAYALAR CHEMICAL FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2012
3.200 m²
Mechanical installations and automatic control systems of Kayalar Chemical Factory management floor’s.
- Heating,
- Cooling,
- Ventilation,
- Building automation systems.
|
|
ELECTRICFIL UNIFIL FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2011
2.500 m²
Mechanical installations and automatic control systems of Electricfil Unifil.
|
|
PAŞABAHÇE ESKİŞEHİR FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2011
20.000 m2
Electro-mechanical installations of Pașabahce Factory’s absorbtion chiller systems in Eskișehir.
|
|
ARÇELİK ESKİŞEHİR FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2010
38 000 m2
Fire protection installations of Eskișehir Arçelik factory warehouse.
|
|
BOSCH REXROTH “ BU 500” FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2009
63.000 m2
Mechanical installations and building automation of Bosch Rexroth Bursa “Bu 501-502-503” Main System Buildings and “Bu 505-506-507-508” Auxillary System Buildings.
- Heating,
- Cooling,
- Ventilation,
- Compresed air,
- Process ventilation,
- Fire protection,
- Heat recovery systems,
- Water treatment,
- Electrical control panels,
- Building automation systems,
- Seismic systems and vibration isolation.
|
|
BOSCH REXROTH GEBZE FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2009
8.600 m2
Mechanical installations of Bosch Rexroth Gebze Factory Management and Production building.
- Heating,
- Cooling,
- Ventilation,
- Compressed air,
- Fire protection,
- Heat recovery systems,
- Water softening,
- Irrigation systems,
- Solar energy systems,
- Electrical control panels,
- Building automation systems.
|
|
BOSCH |
Date of Completion:
Construction Area:
Description of the Work: |
2009
450 m2
Mechanical installations and building automation system (BAS) of Oversensitive Measuring Room (Finemessraum) in Bosch Rexroth Bursa Bu 500 factories. (Room designed for constant temparature and humidity conditions.)
- Heating,
- Cooling (with radiators),
- Ventilation,
- Smoke extraction,
- Fire protection,
- Buliding automation systems (BAS).
|
|
B PLAS ADAPAZARI FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2006
15.000 m2
Mechanical installations of B Plas factory buildings in Adapazarı.
|
|
BOSCH REXROTH “ BU 400” FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2005
21.000 m2
Bosch-Rexroth factory building mechanical installations including building automation system. Preparation of preliminary & execution project,
- Heating,
- Cooling (comfort, process)
- Ventilation,
- Compressed air,
- Heat recovery systems,
- Fire protection,
- Water treatment,
- Boiler room,
- Building automation and electrical system designs and installation works.
|
|
BOSCH BU 300 OVERSENSITIVE MEASURING ROOM |
Date of Completion:
Construction Area:
Description of the Work: |
2004
480 m2
Mechanical installations of Bu 301 Oversensitive Measuring Room (Finemessraum) including building automation systems. (Room designed for constant temperature and humidity conditions.)
- Heating,
- Cooling,
- Ventilation,
- Fire protection,
- Building automation systems.
|
|
METEM TEXTILE FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2004
2.000 m2
Project design and mechanical installations of Çorlu Metem Textile Factory Buildings.
|
|
BOSCH BRAKE FACTORY |
Date of Completion:
Description of the Work: |
2002
Mechanical installations and automatic control systems of Bosch Brake System Factory super heated water & oil systems.
|
|
BOSCH “BU 104” FACTORY |
Date of Completion:
Description of the Work: |
2002
Gas and Tank Foundation's mechanical systems design installations.
|
|
BOSCH “BU 300” FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2001
37.500 m2
Bosch " Bu 301", "Bu 302 ", "Bu 304", "305", "Bu 306 " and "Bu 307," New Factory Buldings automation and building automation system Ppreparation of preliminary & execution project.
- Heating,
- Cooling,
- Ventilation compressed air (low,medium,high),
- Heat rocevery systems,
- Fre protection,
- Water treatment,
- Boiler room,
- Building automation and electrical systems design and installation.
|
|
BOSCH ''BU 101'' FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
2001
22.000 m²
Bursa Bu 101, Bu 101c, Bu 102, Bu 102a, Factory Building’s cooling installations, additional heating/ventilation installations and system automation.
Preperation of preliminary & execution projects,
- Heating,
- Cooling,
- Ventilation
- Process ventilation installations,
- Heat recovery systems,
- Building automation systems,
- Electrical systems design and installation.
|
|
BOSCH “BU 111” BUILDING |
Date of Completion:
Construction Area:
Description of the Work: |
2000
3.000 m2
Mechanical installations and building automation systems of "Bu 111" Dining Hall Building in Bursa.
- Heating,
- Cooling,
- Ventilation,
- Automatic control systems.
|
|
BOSCH “BU 109-110” FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
1999
19.500 m2
Mechanical installations and building automation systems of "Bu 109" and "Bu 110" Common Rail System Production Building's in Bursa. Preparation of preliminary & execution projects, B.O.Q. and specifications.
- Heating,
- Cooling (comfort/process),
- Ventilation,
- Compressed air,
- Fire protection,
- Heat recovery systems,
- Soft and pure water preparation,
- Electrical control panels,
- Building automation systems,
- Pneumatic ventilation valve,
- Additional boiler room installations. ( 3MW)
|
|
SOLLAC FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
1999
6.000 m2
Heating, cooling and fire protection installations of Gemlik Sollac factory building.
|
|
BOSCH “BU 102A” FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
1998
6.600 m2
Mechanical installations and building automation. systems of Bursa, "Bu 102a" New Factory Building in Bursa.
- Heating,
- Ventilation,
- Compressed air,
- Hot/cold water preparation,
- Heat recovery systems,
- Automatic control systems,
- Electrical control panels.
|
|
UGINOX FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
1998
6.500 m2
Heating, cooling, ventilation, radiant heating, compressed air and fire protection installations of Uginox Gebze factory buildings.
|
|
TUPRAȘ IZMIT RAFINERY |
Date of Completion:
Description of the Work: |
1995
Mechanical installations and automatic control systems of Tüpraș İzmit Rafinery Unicracker and connected units.
|
|
BOSCH “BU 101” FACTORY |
Date of Completion:
Construction Area:
Description of the Work: |
1989
5.500 m2
Mechanical installations and automatic control systems of Bursa, "Bu 101" Factory Building's.
- Heating,
- Ventilation,
- Compressed air,
- Hot/cold water preparation,
- Heat recovery systems,
- Automatic control systems,
- Electrical control panels,
- Pneumatic ventilation valves.
|
|
|