COMMUNITY HOMEPAGE FINANCIAL STANDING CONTACT US
REFERENCES
INDUSTRIAL FACILITIES - COMPLETED PROJECTS
GÖZEN SECURITY
KÜTAHYA UNDERGROUND STORAGE FACILITIES
MACHINERY AND CHEMICAL INSTUTE
PAŞABAHÇE MERSİN FACTORY
PAŞABAHÇE ESKİŞEHİR FACTORY
GREEN CHEMICALS
ORGACHEM FACTORY
KAYALAR CHEMICAL FACTORY
ELECTRICFIL UNIFIL FACTORY
PAŞABAHÇE ESKİŞEHİR FACTORY
ARÇELİK ESKİŞEHİR FACTORY
BOSCH REXROTH “ BU 500” FACTORY
BOSCH REXROTH GEBZE FACTORY
BOSCH
B PLAS ADAPAZARI FACTORY
BOSCH REXROTH “ BU 400” FACTORY
BOSCH BU 300 OVERSENSITIVE MEASURING ROOM
METEM TEXTILE FACTORY
BOSCH BRAKE FACTORY
BOSCH “BU 104” FACTORY
BOSCH “BU 300” FACTORY
BOSCH ''BU 101'' FACTORY
BOSCH “BU 111” BUILDING
BOSCH “BU 109-110” FACTORY
SOLLAC FACTORY
BOSCH “BU 102A” FACTORY
UGINOX FACTORY
TUPRAȘ IZMIT RAFINERY
BOSCH “BU 101” FACTORY
GÖZEN SECURITY
Date of Completion:
Description of the Work:
2018
Electromechanical design of Gözen Security buildings in İstanbul Grand Airport.
KÜTAHYA UNDERGROUND STORAGE FACILITIES
Date of Completion:
Description of the Work:
2013

Kütahya Underground Storage Facilities Cooling System.

Construction, mechanical & electrical installations and automation system of cooling and

super refrigerating rooms.

MACHINERY AND CHEMICAL INSTUTE
Date of Completion:
Construction Area:
Description of the Work:
2013
468.000 m

Machinery & Chemicals Instute Ammunitions Factory's central heating system installations,

  • Sanitary,
  • Sewage installations,
  • Super heated water,steam and hot water installations,
  • Steel constructions and pipeline bridge constructions,
  • Concrete works of pipeline supports and administrative buildings rough construction works,
  • Central Heating Plant installations,
  • Electrical installations,
  • Automation systems.
PAŞABAHÇE MERSİN FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2013
14.000 m²

Mechanical installations of absorbtion chiller systems and waste heat boiler systems in Paşabahçe Mersin Factory Buildings.

PAŞABAHÇE ESKİŞEHİR FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2013
48.000 m²

Fire protectioninstallations of Paşabahçe Eskişehir Factories.

  • Monitored fire protection installations of LPG site.
  • Dry type fire protection installations of warehouses.
GREEN CHEMICALS
Date of Completion:
Construction Area:
Description of the Work:
2012
8.000 m²

Mechanical installations of Green Chemical Gebze Factory buildings.

  • Heating,
  • Cooling,
  • Ventilation,
  • Fire protection,
  • Sanitary, 
  • Sewage installations,
ORGACHEM FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2012
4.500 m

Mechanical installations and automatic control systems of Orgachem factory buildings.

  • Heating,
  • Cooling,
  • Ventilation,
  • Fire protection,
  • Domestic water,
  • Sewage water,
  • Automatic control systems.
KAYALAR CHEMICAL FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2012
3.200 m²

Mechanical installations and automatic control systems of Kayalar Chemical Factory management floor’s.

  • Heating,
  • Cooling,
  • Ventilation,
  • Building automation systems.
ELECTRICFIL UNIFIL FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2011
2.500 m²

Mechanical installations and automatic control systems of Electricfil Unifil.

PAŞABAHÇE ESKİŞEHİR FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2011
20.000 m2 

Electro-mechanical installations of Pașabahce Factory’s absorbtion chiller systems in Eskișehir.

ARÇELİK ESKİŞEHİR FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2010
38 000 m2 

Fire protection installations of Eskișehir Arçelik factory warehouse.

BOSCH REXROTH “ BU 500” FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2009
63.000 m2 

Mechanical installations and building automation of Bosch Rexroth Bursa “Bu 501-502-503” Main System Buildings and “Bu 505-506-507-508” Auxillary System Buildings.

  • Heating,
  • Cooling,
  • Ventilation,
  • Compresed air,
  • Process ventilation,
  • Fire protection,
  • Heat recovery systems,
  • Water treatment,
  • Electrical control panels,
  • Building automation systems,
  • Seismic systems and vibration isolation.
BOSCH REXROTH GEBZE FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2009
8.600 m2 

Mechanical installations of Bosch Rexroth Gebze Factory Management and Production building.

  • Heating,
  • Cooling,
  • Ventilation,
  • Compressed air,
  • Fire protection,
  • Heat recovery systems,
  • Water softening,
  • Irrigation systems,
  • Solar energy systems,
  • Electrical control panels,
  • Building automation systems.
BOSCH
Date of Completion:
Construction Area:
Description of the Work:
2009
450 m2 

Mechanical installations and building automation system (BAS) of Oversensitive Measuring Room (Finemessraum) in Bosch Rexroth Bursa Bu 500 factories. (Room designed for constant temparature and humidity conditions.)

  • Heating,
  • Cooling (with radiators),
  • Ventilation,
  • Smoke extraction,
  • Fire protection,
  • Buliding automation systems (BAS).

 

B PLAS ADAPAZARI FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2006
15.000 m2 

Mechanical installations of B Plas factory buildings in Adapazarı.

BOSCH REXROTH “ BU 400” FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2005
21.000 m2 

Bosch-Rexroth factory building mechanical installations including building automation system. Preparation of preliminary & execution project,

  • Heating,
  • Cooling (comfort, process)
  • Ventilation,
  • Compressed air,
  • Heat recovery systems,
  • Fire protection,
  • Water treatment,
  • Boiler room,
  • Building automation and electrical system designs and installation works.
BOSCH BU 300 OVERSENSITIVE MEASURING ROOM
Date of Completion:
Construction Area:
Description of the Work:
2004
480 m2 

Mechanical installations of Bu 301 Oversensitive Measuring Room (Finemessraum) including building automation systems. (Room designed for constant temperature and humidity conditions.)

  • Heating,
  • Cooling,
  • Ventilation,
  • Fire protection,
  • Building automation systems.

 

METEM TEXTILE FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2004
2.000 m2 

Project design and mechanical installations of Çorlu Metem Textile Factory Buildings.

 

BOSCH BRAKE FACTORY
Date of Completion:
Description of the Work:
2002

Mechanical installations and automatic control systems of Bosch Brake System Factory super heated water & oil systems.

BOSCH “BU 104” FACTORY
Date of Completion:
Description of the Work:
2002

Gas and Tank Foundation's mechanical systems design installations.

BOSCH “BU 300” FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2001
37.500 m2 

Bosch " Bu 301", "Bu 302 ", "Bu 304", "305", "Bu 306 " and "Bu 307," New Factory Buldings automation and building automation system Ppreparation of preliminary & execution project.

  • Heating,
  • Cooling,
  • Ventilation compressed air (low,medium,high),
  • Heat rocevery systems,
  • Fre protection,
  • Water treatment,
  • Boiler room,
  • Building automation and electrical systems design and installation.

 

BOSCH ''BU 101'' FACTORY
Date of Completion:
Construction Area:
Description of the Work:
2001
22.000 m²

Bursa Bu 101, Bu 101c, Bu 102, Bu 102a, Factory Building’s cooling installations, additional heating/ventilation installations and system automation.

Preperation of preliminary & execution projects,

  • Heating,
  • Cooling,
  • Ventilation
  • Process ventilation installations,
  • Heat recovery systems,
  • Building automation systems,
  • Electrical systems design and installation.
BOSCH “BU 111” BUILDING
Date of Completion:
Construction Area:
Description of the Work:
2000
3.000 m2 

Mechanical installations and building automation systems of "Bu 111" Dining Hall Building in Bursa.

  • Heating,
  • Cooling,
  • Ventilation,
  • Automatic control systems.
BOSCH “BU 109-110” FACTORY
Date of Completion:
Construction Area:
Description of the Work:
1999
19.500 m2 

Mechanical installations and building automation systems of "Bu 109" and "Bu 110" Common Rail System Production Building's in Bursa. Preparation of preliminary & execution projects, B.O.Q. and specifications.

  • Heating,
  • Cooling (comfort/process),
  • Ventilation,
  • Compressed air,
  • Fire protection,
  • Heat recovery systems,
  • Soft and pure water preparation,
  • Electrical control panels,
  • Building automation systems,
  • Pneumatic ventilation valve,
  • Additional boiler room installations. ( 3MW)
SOLLAC FACTORY
Date of Completion:
Construction Area:
Description of the Work:
1999
6.000 m2 

Heating, cooling and fire protection installations of Gemlik Sollac factory building.

BOSCH “BU 102A” FACTORY
Date of Completion:
Construction Area:
Description of the Work:
1998
6.600 m2 

Mechanical installations and building automation. systems of Bursa, "Bu 102a" New Factory Building in Bursa.

  • Heating,
  • Ventilation,
  • Compressed air,
  • Hot/cold water preparation,
  • Heat recovery systems,
  • Automatic control systems,
  • Electrical control panels.
UGINOX FACTORY
Date of Completion:
Construction Area:
Description of the Work:
1998
6.500 m2 

Heating, cooling, ventilation, radiant heating, compressed air and fire protection installations of Uginox Gebze factory buildings.

TUPRAȘ IZMIT RAFINERY
Date of Completion:
Description of the Work:
1995

Mechanical installations and automatic control systems of Tüpraș İzmit Rafinery Unicracker and connected units.

BOSCH “BU 101” FACTORY
Date of Completion:
Construction Area:
Description of the Work:
1989
5.500 m2 

Mechanical installations and automatic control systems of Bursa, "Bu 101" Factory Building's.

  • Heating,
  • Ventilation,
  • Compressed air,
  • Hot/cold water preparation,
  • Heat recovery systems,
  • Automatic control systems,
  • Electrical control panels,
  • Pneumatic ventilation valves.
2011 © Copyright Etkin Group of Companies