REFERENCES
COMFORT APPLICATIONS - COMPLETED PROJECTS
ALLIANZ INSURANCE SECURITY BUILDING , İSTANBUL
KARE CONFECTION
L'OREAL CANAN KOZMETİK
HUNGER RESTAURANT
BOSCH HEAD QUARTER
EEC ELECTRONICS
PENTİ STORE
STARBUCKS STORE
GOZEN HOLDING
IŞIL APARTMENT, FENERBAHÇE
DOĞUŞ OTO POWER CENTER BENTLEY, LAMBORGHINI
DOĞUŞ OTO POWER CENTER AUDI, SKODA
ŞEN APARTMENT SUADİYE, İSTANBUL
GAZETECİLER SİTESİ, MASLAK
BOSCH HEAD QUARTER, KÜÇÜKYALI
DOĞUŞ POWER CENTER PORSCHE
ALEMARA TUZLA HOUSING AND SOCIAL FACILITY PROJECT, İSTANBUL
DOUBLE TREE BY HILTON AVCILAR HOTEL
ING BANK NEW LOBBY, FITNESS CENTER
SUPERONLINE HEAD OFFICE BUILDING
DOĞUŞ POWER CENTER
ÜMRANİYE UNDERGROUND CRAFTSMAN MARKET SQUARE’S
ACCESS TURKEY
TYUMEN SIBERIA SANATORIUM, RUSSIA
TAZOVSKY SCHOOL DORMITORY AND SPORTS HALL, RUSSIA
GAS STATIONS, ASGHABAT
RITZ CARLTON MOSCOW HOTEL
ANTALYA RESIDENCE AND BUSINESS CENTER
ATATÜRK OLIMPIC STADIUM
DOĞUŞ AIR HANGAR BUILDING, İSTANBUL
BAŞARI ELECTRONIC, İSTANBUL
DOĞUŞ AIR HANGAR BUILDING, İSTANBUL
ING BANK (OSMANLI BANK) HEAD OFFICE BUILDING
BANK EKSPRES A.S. HEAD OFFICE, İSTANBUL
DOĞUȘ HOLDING CO. HEAD OFFICE BUILDING
MOSCOW MOSBUSINESS BANK
MOSCOW NEGLINNAYA STOLICHNY BANK
TEKFENBANK HEAD OFFICE (EUROBANK TEKFEN)
MOSCOW INDUSTRIAL BANK
MOSCOW TAX OFFICE
GARANTİ YATIRIM BANK HEAD OFFICE BUILDING
GARANTİ LEASING HEAD OFFICE BUILDING
DOĞUȘ CONSTRUCTION TRADING CO. HEAD OFFICE BUILDING
GARANTİ BANK
TEKFENBANK
OTTOMAN BANK
HSBC BANK
WESTDEUTSCHE LANDES BANK (EUROPE) AG
ESBANK
TANSAŞ SUPERMARKET CHAIN
MİGROS SUPERMARKET CHAIN
MACROCENTER SUPERMARKET CHAIN
KOÇTAŞ
CARREFOUR
ȘOK SUPERMARKET CHAIN
|
ALLIANZ INSURANCE SECURITY BUILDING , İSTANBUL |
Date of Completion:
Construction Area:
Description of the Work: |
2018
250 m2
Allianz Tower Security Building construction, mechanical and electrical works .
|
|
KARE CONFECTION |
Date of Completion:
Construction Area:
Description of the Work: |
2018
3.2750 m2
Construction, electrical, mechanical installation, automation and decoration works of KARE KONFEKSİYON Office, Show Room and production building in İstanbul.
|
|
L'OREAL CANAN KOZMETİK |
Date of Completion:
Description of the Work: |
2018
L’oreal Canan Kozmetik chiller units installation and renovation works.
|
|
HUNGER RESTAURANT |
Date of Completion:
Description of the Work: |
2018
Mechanical installations of HUNGER RESTAURANT Piazza AVM, Maltepe/ İstanbul.
|
|
BOSCH HEAD QUARTER |
Date of Completion:
Description of the Work: |
2018
Bosch HQ İstanbul, ground floor revision and fit-out works.
|
|
EEC ELECTRONICS |
Date of Completion:
Construction Area:
Description of the Work: |
2017-2018
1.850 m2
EEC Electronics HQ Güneşli, offices and production area fit-out works.
|
|
PENTİ STORE |
Date of Completion:
Description of the Work: |
2017
Architectural, electrical, mechanical installation and decoration work completed out by our PENTİ stores;
* Grand Pera
* Bursa Suryapı Marka AVM,
* Taksim,
* Ankara Cepa AVM,
* İstanbul Hilltown AVM,
* Esenyurt City Center AVM,
* Vadistanbul AVM,
* Zafer Plaza AVM,
|
|
STARBUCKS STORE |
Date of Completion:
Description of the Work: |
2017
Architectural, electrical, mechanical installation and decoration work completed out by our STARBUCKS stores;
* Beylikdüzü Cumhuriyet
* Optimum AVM
|
|
GOZEN HOLDING |
Date of Completion:
Construction Area:
Description of the Work: |
2017
3.700 m2
Electromechanical design and application consultancy of Gözen Holding Head Office building.
|
|
IŞIL APARTMENT, FENERBAHÇE |
Date of Completion:
Construction Area:
Description of the Work: |
2017
3.154 m2
- Finishing works and main construction works,
- Landscaping works,
- Facade and framework installations,
- Sanitary installations,
- Electrical installations,
- CC security systems,
- CCTV systems,
- Elevator and generator installations.
|
|
DOĞUŞ OTO POWER CENTER BENTLEY, LAMBORGHINI |
Date of Completion:
Construction Area:
Description of the Work: |
2016
800 m2
Electro-mechanical installations of Doğuş Oto Power Center Bentley, Lamborghini showroom and Office, Maslak/İstanbul.
- Heating,
- Cooling,
- Ventilation,
- Fire Protection,
- Sanitary installations,
- Electrical installations,
- CCTV,
- Natural gas installations.
|
|
DOĞUŞ OTO POWER CENTER AUDI, SKODA |
Date of Completion:
Construction Area:
Description of the Work: |
2016
4.500 m2
Electro-mechanical installations of Doğuş Oto Power Center Audi, Skoda showroom, services and Office, Maslak/İstanbul.
- Heating,
- Cooling,
- Ventilation,
- Fire Protection,
- Sanitary installations,
- Electrical installations,
- CCTV,
- Natural gas installations.
|
|
ŞEN APARTMENT SUADİYE, İSTANBUL |
Date of Completion:
Construction Area:
Description of the Work: |
November 2015
2.898 m2
- Finishing works and main construction works,
- Landscaping works,
- Facade and framework installations,
- Sanitary installations,
- Electrical installations,
- CC security systems,
- CCTV systems,
- Elevator and generator installations.
|
|
GAZETECİLER SİTESİ, MASLAK |
Date of Completion:
Description of the Work: |
2014
Maslak Gazeteciler Sitesi, HEAT METER (calorimeter) system application.
|
|
BOSCH HEAD QUARTER, KÜÇÜKYALI |
Date of Completion:
Construction Area:
Description of the Work: |
October 2014
13.500 m
Construction, electrical, mechanical installation, automation and decoration works of Bosch Head Quarter in İstanbul.
- Heating,
- Cooling,
- Ventilation,
- Construction,
- Electrical,
- Fire protection,
- Sanitary,
- Sewage installations,
- Decoration,
- Automation.
|
|
DOĞUŞ POWER CENTER PORSCHE |
Date of Completion:
Construction Area:
Description of the Work: |
2013
4.500 m
Mechanical installations of Doğuş Power Center Porsche showrooms and services.
- Heating,
- Cooling,
- Ventilation,
- Fire protection,
- Sanitary installations,
- Natural Gas System Installation.
|
|
ALEMARA TUZLA HOUSING AND SOCIAL FACILITY PROJECT, İSTANBUL |
Date of Completion:
Construction Area:
Description of the Work: |
2012
9.918 m²
Alemara Tuzla project is designed 2 blocks and 74 flats with social facilities as a turn-key project.
- Heating installations,
- Fire protection installations,
- Ventilation systems,
- Sanitary installations,
- Electrical installation,
- Closed-circuit security system,
- Central satellite and TV system,
- Lift and generator systems.
- Finishing works and main construction works,
- Landscaping works,
- Facade and framework installations,
- Central heating system,
- CC security systems,
- CCTV systems,
- Elevator and generator installations,
- Swimming pool.
|
|
DOUBLE TREE BY HILTON AVCILAR HOTEL |
Date of Completion:
Construction Area:
Description of the Work: |
2012
27.000 m2
Mechanical installations and building automation of Double Tree By Hilton Avcılar Hotel.
- Heating,
- Cooling,
- Ventilation,
- Fire protection,
- Sanitary,
- Sewage installations,
- VRV installations,
- Solar systems.
|
|
ING BANK NEW LOBBY, FITNESS CENTER |
Date of Completion:
Construction Area:
Description of the Work: |
2012
1.450 m²
Electro-mechanical installations of ING bank new lobby, fitness center and Office floors.
- Sanitary,
- Sewage installations,
- Electrical installations,
- Automation systems,
|
|
SUPERONLINE HEAD OFFICE BUILDING |
Date of Completion:
Construction Area:
Description of the Work: |
2011
1.400 m2
Mechanical installations of Superonline Head Office Building.
- Heating,
- Cooling, Ventilation,
- Fire protection,
- Automatic control systems.
|
|
DOĞUŞ POWER CENTER |
Date of Completion:
Construction Area:
Description of the Work: |
2010
6.450 m2
Mechanical installations and automatic control systems of Doğuş Power Center VW-Seat-Audi showrooms and services.
- Heating,
- Cooling,
- Ventilation,
- Fire protection,
- Sanitary installations,
- Automatic Control Systems.
|
|
ÜMRANİYE UNDERGROUND CRAFTSMAN MARKET SQUARE’S |
Date of Completion:
Construction Area:
Description of the Work: |
2010
875 m2
Mechanical installations of Ümraniye Underground Craftsman Market Square’s.
- Heating,
- Cooling,
- Ventilation,
- Fire protection,
- Domestic water,
- Sewage water.
|
|
ACCESS TURKEY |
Date of Completion:
Construction Area:
Description of the Work: |
2010
600 m2
Mechanical installations of Access Turkey Building.
|
|
TYUMEN SIBERIA SANATORIUM, RUSSIA |
Date of Completion:
Construction Area:
Description of the Work: |
2009
7.500 m2
Tyumen Siberia Sanatorium project; mechanical installation works of superstructure and infrastructure,
- Heating,
- Ventilation,
- Sanitary,
- Fire protection,
- All infrastructure installations,
- Automatic control systems,
- Pool installations.
|
|
TAZOVSKY SCHOOL DORMITORY AND SPORTS HALL, RUSSIA |
Date of Completion:
Construction Area:
Description of the Work: |
2009
7.500 m2
Tazovsky School Dormitory and Sports Hall projects; mechanical installation works of superstructure and infrastructure
- Heating,
- Ventilation,
- Sanitary,
- Fire protection,
- All infrastructure works,
- Automatic control system.
|
|
GAS STATIONS, ASGHABAT |
Date of Completion:
Construction Area:
Description of the Work: |
2008
1.000 m2
Electrical & mechanical, installations of Babarap and AZS90 Gas Station in Ashgabat. Preparation of preliminary & execution projects, B.O.Q and specifications.
- Heating,
- Cooling,
- Ventilation,
- Fire protection,
- Domestic water,
- Sewage water,
- Irrigation system,
- Rain water,
- Electrical installations,
- Pump and tank automation system,
- Process installations.
|
|
RITZ CARLTON MOSCOW HOTEL |
Date of Completion:
Construction Area:
Description of the Work: |
2007
55.000 m2
Ritz Carlton Moscow Hotel Building's,
- Heating,
- Cooling,
- Mechanical room,
- Fire protection installations,
- As-built projects.
|
|
ANTALYA RESIDENCE AND BUSINESS CENTER |
Date of Completion:
Construction Area:
Description of the Work: |
2007
9.050 m²
There are 36 detached units which consist of 24 apartments, 4 units at each of 6 floors, 6 offices on first floor and 6 triplex shops on the ground floor.
|
|
ATATÜRK OLIMPIC STADIUM |
Date of Completion:
Description of the Work: |
2005
Underground mechanical installations of Atatürk Olympic Stadium.
- Facade cladding,
- Interior finishing works 60.000 m2,
- Landscaping works.
- All expansion joints works.
|
|
DOĞUŞ AIR HANGAR BUILDING, İSTANBUL |
Date of Completion:
Construction Area:
Description of the Work: |
2001
3.000 m2
- All steel construction work,
- Aluminium and metal cladding facade works,
- Roof covering.
|
|
BAŞARI ELECTRONIC, İSTANBUL |
Date of Completion:
Construction Area:
Description of the Work: |
2000
6.000 m2
- All steel construction works,
- Copper covering work,
- Aluminium work,
- Wood works,
- Interior finishing works.
|
|
DOĞUŞ AIR HANGAR BUILDING, İSTANBUL |
Date of Completion:
Construction Area:
Description of the Work: |
2000
10.000 m
- Facade cladding,
- Stainless steel works.
|
|
ING BANK (OSMANLI BANK) HEAD OFFICE BUILDING |
Date of Completion:
Construction Area:
Description of the Work: |
1998
37.600 m2
Mechanical installations and building automation systems of ING Bank Head Office Building. Preparation of preliminary & execution projects, B.O.Q.and specifications,
- Heating,
- Cooling,
- Ventilation,
- Fire protection,
- Sanitary,
- Sewage,
- Domestic water,
- Rain water installations,
- Facade cladding,
- Granite facade work,
- Aluminium doors & windows,
- Intenor finishing works,
- Stell structure roof and cupper covering works,
- Electrical control panels.
- Building automation system.
|
|
BANK EKSPRES A.S. HEAD OFFICE, İSTANBUL |
Date of Completion:
Construction Area:
Description of the Work: |
1998
35.000 m2
- Facade cladding,
- Aluminium facade cladding
- Facade granite works,
- Steel construction and stainless steell works,
- Facade cleaning elevators,
- Interior finishing works.
|
|
DOĞUȘ HOLDING CO. HEAD OFFICE BUILDING |
Date of Completion:
Construction Area:
Description of the Work: |
1997
4.500 m2
Mechanical installations and automatic control systems of Doğuș Holding Co. Head Office Building. Preparation of preliminary & execution projects, B.O.Q.and specifications.
- Heating,
- Cooling,
- Ventilation,
- Fire protection,
- Sanitary installations,
- Electrical control panels,
- Automatic control systems.
|
|
MOSCOW MOSBUSINESS BANK |
Date of Completion:
Construction Area:
Description of the Work: |
1997
7.500 m2
Heating, cooling, ventilation and fire protection installations of Moscow Mosbusiness Bank Zelenograd Branch.
|
|
MOSCOW NEGLINNAYA STOLICHNY BANK |
Date of Completion:
Construction Area:
Description of the Work: |
1996
27.500 m2
Cooling and ventilation installations of Moscow Neglinnaya Stolichny Savings Bank.
|
|
TEKFENBANK HEAD OFFICE (EUROBANK TEKFEN) |
Date of Completion:
Construction Area:
Description of the Work: |
1995
5.000 m2
Mechanical installations and automatic control systems of Tekfenbank Head Office Building. Preparation of preliminary & execution project, B.O.Q.and specifications,
- Heating,
- Cooling,
- Ventilation,
- Fire protection,
- Sanitary,
- Sewage installations ,
- Electrical control panels,
- Automatic control systems.
|
|
MOSCOW INDUSTRIAL BANK |
Date of Completion:
Construction Area:
Description of the Work: |
1995
6.000 m2
Mechanical installations, project and controlling of Moscow Industrial Bank's Zelenograd Branch.
|
|
MOSCOW TAX OFFICE |
Date of Completion:
Construction Area:
Description of the Work: |
1995
15.000 m2
Heating and ventilation installations of Moscow Tax Office.
|
|
GARANTİ YATIRIM BANK HEAD OFFICE BUILDING |
Date of Completion:
Construction Area:
Description of the Work: |
1994
3.000 m2
Mechanical installations and automatic control systems of Garanti Yatırım Bank Head Office Building.
|
|
GARANTİ LEASING HEAD OFFICE BUILDING |
Date of Completion:
Construction Area:
Description of the Work: |
1994
2.000 m2
Mechanical installations and automatic control systems of Garanti Leasing Head Office Building.
|
|
DOĞUȘ CONSTRUCTION TRADING CO. HEAD OFFICE BUILDING |
Date of Completion:
Construction Area:
Description of the Work: |
1993
11.000 m2
Mechanical installations and automatic control systems of Doğuș Yapı Sanayi A.Ș. Head Office Building. Preliminary and execution projects,
- Heating,
- Cooling,
- Ventilation,
- Fire protection ,
- Sanitary installations,
- Domestic water,
- Automatic control systems,
- Aluminium facade works (4.500 m2).
|
|
GARANTİ BANK |
Description of the Work: |
HVAC project and installations of 4 Garanti Bank Branches in İstanbul.
|
|
TEKFENBANK |
Description of the Work: |
HVAC project and installations of 27 Tekfenbank Branches around Turkey.
|
|
OTTOMAN BANK |
Description of the Work: |
HVAC project and installations of 77 Ottoman Bank Branches and 11 other departments around Turkiye.
Other divisons of Ottoman Bank:
• Ankara Merops (Central operation building)
• Ege Merops (Central operation building)
• Beyoğlu, Historical Research building
• Bulgur Palas, Archives building
• Bulgur Palas, additional archives building.
• Training Center / Ankara
• Training Center / İstanbul
• Karaköy Ex-head office.
• Karaköy Ex-head office archives offices fire protection systems by FM 200 (gaseous systems)
• Heating, cooling, water, refinement and sanitary installations at Alanya resort village owned by PEYS
• Mersin, warehouse fire protection systems installation.
|
|
HSBC BANK |
Description of the Work: |
HVAC project and installations of İzmir Alsancak Branches.
|
|
WESTDEUTSCHE LANDES BANK (EUROPE) AG |
Description of the Work: |
Heating, cooling, ventilation, sanitary and fire protection systems design and installation of Head Office.
|
|
ESBANK |
Description of the Work: |
HVAC project and installations of 26 Tekfenbank Branches around Turkey.
|
|
TANSAŞ SUPERMARKET CHAIN |
Description of the Work: |
Electro-mechanical installations of over 400 supermarket around Turkiye.
|
|
MİGROS SUPERMARKET CHAIN |
Description of the Work: |
Electro-mechanical installations of over 350 supermarket around Turkiye.
|
|
MACROCENTER SUPERMARKET CHAIN |
Description of the Work: |
Electro-mechanical installations of over 10 supermarket around Turkiye.
|
|
KOÇTAŞ |
Description of the Work: |
Electro-mechanical installations of over 25 stores around Turkiye.
|
|
CARREFOUR |
Description of the Work: |
Electro-mechanical installations of over 50 stores around Turkiye.
|
|
ȘOK SUPERMARKET CHAIN |
Description of the Work: |
Electro-mechanical installations of over 250 supermarket around Turkiye.
|
|
|